Installation of 60ft deep 24” driller piers for three new towers
Installation of three cantilevered and anchored soldier pile and lagging walls
Hauling of spoils and survey included in Axiom’s scope
Turn-key coordination of design with structural engineer was provided

Project Scope

Design and install 24” drilled piers for deep foundations and anchored temporary soldier pile and lagging walls